The time required to fuse together 3000 feet of 12-inch HDPE (High-Density Polyethylene) pipe can vary depending on several factors, including the experience of the personnel, the fusion equipment being used, the ambient conditions, and the specific fusion method employed.

HDPE pipe fusion typically involves using heat and pressure to join the pipe segments. The two most common methods used for HDPE pipe fusion are butt fusion (also known as butt welding) and electrofusion. Butt fusion involves heating the pipe ends and then joining them together by applying pressure, while electrofusion utilizes specialized fittings with embedded heating elements fused to the pipe ends.

HPDE Pipe Fusion

HDPE Pipe Butt Welding – Time and Cost Estimation, and Savings

For a rough estimate, assuming an experienced crew and efficient fusion equipment, it is generally considered that fusion rates for HDPE pipe butt fusion (or butt welding) range from 6 to 12 inches per minute. However, this can vary depending on the specific fusion machine and operator proficiency.

  • To estimate the fusion time for 3000 feet of 12-inch HDPE pipe, calculate the number of pipe joints required. Assuming a standard pipe length of 40 feet, you would have 3000/40 = 75 pipe segments. Each joint requires two fusion operations (one at each end of the pipe segment).
  • Assuming a fusion rate of 8 inches per minute, the total fusion time per joint would be approximately (12 inches / 8 inches per minute) x 2 = 3 minutes. Then the most crucial consideration is the cooling time needed per joint, which would be approximately 30-min per joint. 
  • Thus, the estimated total fusion time and cooling time for 75 joints would be 75 joints x 3 minutes per joint = 225 minutes, or 3 hours and 45 minutes, and then the cooling time would be 75 joints x 40 minutes per joint = 3000 minutes, or 50 hours for a total time of 3225 minutes or 53 hours and 45 minutes.  

GET PRICING

Ask us how much money you could save using an EDDY Pump!

EDDY Pump’s fused dredge pipe sections will save you 52 hours and 30 minutes, or based on an 8-hour day; you would save over 6 days onsite assembling your pipeline.

Now, if we want to quantify the labor costs based on $75.00 per hour, fusing the pipes will require two people, so 53 hours and 45 minutes x $75.00 per hour x 2 people will give you a total cost of about $8,000.00 and that does not even include the cost of the fusion machine which could easily cost an additional $1,500.00 to rent for a week.   On the other hand, using the EDDY Pump dredge pipe sections, you only need one person, and your cost would be $75.00 x 1 hour and 15 minutes or $93.75. Cost savings of over $9,000.00 and 6 days faster to begin your project!   Plus, this does not even include the time and cost savings for disassembly!  

HPDE Pipe Fusion total labour cost savings
HPDE Pipe Fusion total labour cost savings

EDDY Pump’s fused dredge pipe sections will save you 52 hours and 30 minutes, or based on an 8-hour day; you would save over 6 days onsite assembling your pipeline.

Now, if we want to quantify the labor costs based on $75.00 per hour, fusing the pipes will require two people, so 53 hours and 45 minutes x $75.00 per hour x 2 people will give you a total cost of about $8,000.00 and that does not even include the cost of the fusion machine which could easily cost an additional $1,500.00 to rent for a week.   On the other hand, using the EDDY Pump dredge pipe sections, you only need one person, and your cost would be $75.00 x 1 hour and 15 minutes or $93.75. Cost savings of over $9,000.00 and 6 days faster to begin your project!   Plus, this does not even include the time and cost savings for disassembly!  

It’s important to note that this estimate is a rough approximation and can vary based on the specific conditions and factors mentioned earlier. Factors such as site preparation, pipe handling, and quality control procedures should also be considered when planning and estimating the time required for a pipe fusion project.

On the other hand, utilizing EDDY Pump’s already fused HDPE pipe sections with Bauer fittings, it will take about 30 sec to assemble each section.   So for this example, if we have 20-ft sections, that would be 3000-ft / 20-ft sections or 150 total at 30 seconds per section, making it a total of 75 minutes or 1 hour and 15 minutes.  

HDPE Pipe
HDPE Pipe

It’s important to note that this estimate is a rough approximation and can vary based on the specific conditions and factors mentioned earlier. Factors such as site preparation, pipe handling, and quality control procedures should also be considered when planning and estimating the time required for a pipe fusion project.

On the other hand, utilizing EDDY Pump’s already fused HDPE pipe sections with Bauer fittings, it will take about 30 sec to assemble each section.   So for this example, if we have 20-ft sections, that would be 3000-ft / 20-ft sections or 150 total at 30 seconds per section, making it a total of 75 minutes or 1 hour and 15 minutes.  

Conclusion 

Choosing the correct method and equipment can significantly impact project timelines and costs in HDPE pipe fusion. By exploring butt fusion and EDDY Pump‘s fused dredge pipe sections, you can streamline the fusion process, estimate time requirements, and maximize cost savings. Whether achieving faster assembly with EDDY Pump or considering labor costs and efficiency, this comprehensive guide empowers designers and developers to make informed decisions for successful environmental remediation projects. Harness the power of HDPE pipe fusion to transform your operations with EDDY Pump. Also, check out EDDY Pump’s various ancillary dredge products or accessories to gain more insight on our offering.

Sales and Selection Help

Let our sales or engineering support help in your pump selection
Call 619-404-1916