TECHNICAL SPECIFICATIONS
Environmental Dredge Technical Specifications
This sediment removal equipment is a single 6-inch spud ladder configuration. The figures below are from the current specification sheet.
| Specification | Value |
|---|---|
| Dredge type | Spud ladder environmental dredge |
| Pump | 6-inch HDX heavy-duty high-chrome EDDY Pump |
| Non-clog | Non-clog pump design for abrasive, high-solids slurry |
| Pump power | 400 HP |
| Production | 300 to 400 cubic yards per hour |
| Maximum digging depth | 27 feet |
| Suction system | Rotating suction head with cutting teeth, configurable for terrain following |
| Dredge height | 19 feet |
| Spud height | 40 feet |
| Overall weight (approx.) | 150,000 lbs |
| Assembled length (typical) | 90 feet |
| Assembled width | 22 feet 6 inches |
| Hydraulic power unit | 40 HP |
| Minimum power | 350 kW marine generator |
| Discharge pipeline | 8-inch HDPE |
| Flowmeter | 8-inch magnetometer type |
| Transport | All components designed for non-permit over-road transport |
| Mobilization and setup (typical) | One day |
| Optional equipment | Booster pump for long discharge distances; in situ radioactive densitometer for slurry density |
PUMP CURVE
6-Inch HDX EDDY Pump Curve
The pump curve shows how the 6-inch HDX EDDY Pump in this dredge performs across its operating range. Use it to check flow against head for your discharge distance. Curves change with speed and slurry, so we can build a custom dredge pump curve for your duty.
POSITIONING AND CONTROLS
Positioning, Controls and Flow Monitoring
Accurate cuts depend on knowing where the head is, how deep it is working and how much slurry is moving. These are the systems on board.
01
Dual RTK GPS
Dual RTK GPS tracks the dredge head position and vessel heading with centimeter-level accuracy, depending on site conditions.
02
Spud and Carriage Sensors
Spud height and carriage travel sensors support automated spud controls, so the dredge advances in consistent steps.
03
Rotating Suction Head
The rotating head with cutting teeth can be configured for terrain following. With the positioning data, this dredging machine for sediment control helps hold each cut to the dredge plan.
04
Flow Monitoring
An 8-inch magnetometer-type flowmeter measures slurry flow in real time, and generator and main pump electrical load are monitored in amps. An in situ radioactive densitometer for slurry density is optional.
05
Operator Controls
The second-floor pilot house has a joystick-enabled operator chair, an auxiliary lever panel and an HMI screen. Additional control stations sit in the lower equipment room.
06
Hydraulics and Software
A 40 HP hydraulic power unit runs the ladder swing winches, suction-head articulation, knife gates and deck equipment. HYPACK and DREDGEPACK software handle dredging management and positioning.
SITE REQUIREMENTS
Power, Pipeline and Site Requirements
Plan these items before you request a quote. Together they decide whether the dredge fits your site.
| Requirement | What to plan |
|---|---|
| Power | A minimum 350 kW marine generator. Ask us about supplying it. |
| Discharge line | An 8-inch HDPE pipeline. Ask us about supplying it. |
| Long distances | For a dredge pump for pumping long distances, an optional booster pump can be added when the discharge distance calls for one. See skid-mounted booster pumps. |
| Transport | All components are designed for non-permit over-road transport. Overall weight is about 150,000 lbs, with a typical assembled length of 90 feet and width of 22 feet 6 inches. |
| Setup | Typical mobilization and setup takes one day. |
| Clearance | Dredge height is 19 feet and spud height is 40 feet. Check launch, recovery and overhead clearance on site. |
| Slurry density | An optional in situ radioactive densitometer gives real-time slurry density. |
FIND YOUR STARTING POINT
Environmental Dredge or Another EDDY Dredge?
Match your project to the dredge built for it. If your site fits more than one row, our team can help you compare.
| If your project looks like this | Choose | Why |
|---|---|---|
| Contaminated or sensitive sediment that needs accurate cutting, positioning and monitoring | Environmental Dredge | 6-inch, 400 HP spud ladder dredge. 300 to 400 cubic yards per hour, to 27 feet. |
| A clay-, poly- or concrete-lined pond | Liner-Safe Dredging Options | Options built to protect the liner, using low ground pressure, controlled bottom contact and precise positioning. |
| Lagoon sludge, muck or other viscous material | Dredge Sled | A lagoon dredge pump for sludge, muck and other viscous or abrasive material. |
| A pump hung from a crane, excavator or barge A-frame | Cable-Deployed Dredge Pump | A submersible pump in 4 to 12 inch sizes, with an optional water jetting ring for compacted sediment. |
| Underwater work run by remote control | Subdredge | A remote-operated submersible dredge, hydraulic or electric. |
| An unmanned barge-based dredge | Barge Dredge | A remote-controlled barge dredge positioned by an onboard winch. |
| Placing dredged material or cap material, not removing it | Automated TLP System | Thin-layer placement equipment that controls where dredged sediment is delivered. |
| A long discharge line | Skid-Mounted Booster Pumps | Boosters that maintain flow and line velocity over long pipeline runs. |
Other EDDY Dredge Equipment
TURBIDITY CONTROL
How This Dredge Limits Turbidity
No dredging method creates zero turbidity. A dredging method to minimize turbidity removes only what the plan calls for and disturbs as little of the surrounding sediment as possible. On this dredge, that comes down to four things:
01
Controlled Cutting
A rotating suction head with cutting teeth removes sediment at the face.
02
Accurate Positioning
Dual RTK GPS places the head and sets the vessel heading.
03
Depth Control
Spud height and carriage travel sensors support consistent cuts, which helps avoid overcutting.
04
Monitoring
Real-time flow measurement, with optional slurry density measurement, shows what the dredge is moving.
Results still depend on the material, the site and the operating plan. Turbidity limits come from the project’s permits and monitoring plan.
ENVIRONMENTAL DREDGING
What Is Environmental Dredging?
Environmental dredging is the targeted removal of contaminated sediment from lakes, rivers, ponds, wetlands and shorelines, planned so that disturbance to the surrounding bottom and water stays as low as the site allows.
It differs from dredging done only to deepen a channel. The project sets removal limits first, then relies on accurate positioning, controlled cutting, monitoring and a safe place for the dredged material. An environmental dredge is the equipment that does the cutting and pumping, and the project plan decides how well it performs.
WHERE IT FITS
Sediment Removal Equipment for Environmental Projects

Contaminated Sediment Removal
Dredging equipment for environmental remediation in lakes, ponds and shorelines, where removal limits, accurate positioning and monitoring drive the work.

Wetlands and Habitat Projects
A low-turbidity dredge for wetlands and habitat work, where controlled cutting and accurate positioning help limit disturbance to the surrounding area.

Lakes, Reservoirs and Waterways
Lake and reservoir dredging to recover lost capacity, with depth control to 27 feet for waterways that need targeted sediment removal.
River Dredging Equipment for Rivers and Canals
The spud ladder holds the dredge in position for steady work in flowing water and over a varying bottom, while it follows the dredge plan. The non-clog, high-chrome pump handles debris-laden sediment. Removing built-up sediment helps restore flow capacity and maintain navigability.

Municipal and Wastewater Lagoons
Dredging equipment for government and municipal water projects, from public waterways to wastewater lagoons where settled sludge must be removed. Built by EDDY Pump, a U.S. dredging equipment manufacturer.

Industrial Sediment Removal
Industrial sediment removal where abrasive solids and debris must be pumped. The high-chrome pump is built for abrasive service.
ENVIRONMENTAL REMEDIATION
Contaminated Sediment Removal on the St. Clair River
Dow Chemical Canada had to clear contaminated sediment from a steep, soft-clay riverbank without digging into the clay below. Here is how an EDDY Pump dredge removed it.

The Challenge
Dow Chemical Canada needed contaminated sediment removed along about 3,000 feet of the St. Clair River shoreline, an area of roughly 375,000 square feet within one of the 42 Great Lakes Areas of Concern. Contaminated layers ranged from 3 inches to more than 9 feet deep on soft, highly plastic clay, across a bottom with slopes of up to 45 degrees. Contaminants included mercury, cadmium, lead and chlorinated organic compounds. The dredge had to take the contaminated layer and leave the clay.

The Approach
EDDY Pump built a Tornado II (T2) dredge with an articulated head for work across the changing bottom in 2 to 30 feet of water. It pumped slurry at 30 to 80% solids through 3,500 feet of pipe with a 70-foot rise to a holding pond, holding a flow of 1,900 to 2,000 GPM. Flocculants and polymers were added at the pond. Turbidity was monitored at the dredge head and 75 feet downstream, and water was sampled for chemical constituents and total suspended solids.

The Result
Work ran in three phases from May 2002 to December 2004. The T2 dredge removed about 28,000 cubic yards of contaminated sediment from the shoreline, taking out 98 to 100% of the depositional sediment. The work covered the full 375,000 square feet of the project area, through contaminated layers from 3 inches to more than 9 feet deep and slopes of up to 45 degrees. Turbidity and water quality were monitored at the dredge head and 75 feet downstream while the clay beneath was left in place.
PROJECT PLANNING
Planning an Environmental Dredging Project
Environmental performance depends on the complete design and operating plan, not on the dredge alone. A typical project follows these steps:
01
Define the contaminants, sediment layers and removal limits.
02
Set water-quality and turbidity criteria with the project team and regulators.
03
Match the dredge, cut plan and positioning to those limits.
04
Plan the pipeline, containment, treatment and dewatering for the dredged sediment.
05
Set up monitoring and documentation to verify results and acceptance.
GET A FASTER QUOTE
Send Us Your Site Details
Share what you know and we will help define the rest. These details let our team size the system and quote it.

RESOURCES
Downloads and Technical Resources
Pull the specs, curves and case studies you need to plan your environmental dredging project.
| Resource | What it covers | Link |
|---|---|---|
| Environmental dredge spec sheet | Dimensions, weights, power, pipeline and equipment details for the 6-inch spud ladder dredge. | Download the spec sheet (PDF) |
| Pump curve | Performance of the 6-inch HDX EDDY Pump. Custom curves are built for your duty. | Request a custom pump curve |
| St. Clair River case study | Contaminated sediment removal along a 3,000-foot shoreline. | Download the case study (PDF) |
| Brochures and specs | EDDY Pump product brochures and specification sheets. | Browse brochures and specs |
| More case studies | Other EDDY Pump dredging and pumping projects. | View case studies |
STILL HAVE QUESTIONS? TALK TO US
Environmental Dredging FAQs
What is an environmental dredge, and how is it different from conventional dredging equipment?
An environmental dredge is built for controlled removal of sediment in sensitive waterways. Compared with conventional dredging equipment, the focus is on accurate positioning, controlled cutting and monitoring, so the project can remove targeted sediment while limiting disturbance. The EDDY Pump Environmental Dredge is a spud ladder dredge with a 6-inch, 400 HP pump and a rotating suction head.
Does environmental dredging create no turbidity?
No. No dredging method creates zero turbidity. This dredge is designed to limit disturbance through controlled cutting, accurate positioning and depth control. The turbidity limits for a project come from its permits and monitoring plan, and the operating plan is built to meet them.
What is the best dredge for sediment removal?
The best dredge depends on the material, water depth, site access, production target, discharge distance and any liner or permit limits. This spud ladder dredge suits larger removal jobs, at 300 to 400 cubic yards per hour to a depth of 27 feet. For lined ponds, shallow sites or remote-operated work, compare the options in the table above or talk to our team.
What is the best dredge for lakes and waterways?
For lakes and waterways where sediment must be removed to a plan, down to 27 feet at 300 to 400 cubic yards per hour, this environmental dredge is built for the job. Small ponds, lined lagoons and shallow sites may suit a Dredge Sled, a Liner-Safe option or a Cable-Deployed Dredge Pump instead.
What dredging equipment is best for environmental remediation of contaminated sediment?
The best equipment depends on the contaminants, the sediment layers and the removal limits. Equipment for contaminated sediment removal in lakes and ponds, or in rivers and along shorelines, has to remove targeted layers, move slurry to containment and support monitoring. This dredge pairs a rotating suction head and accurate positioning with a high-chrome, non-clog pump for abrasive, high-solids slurry. Containment, treatment, dewatering and disposal still need to be planned for the whole project, as they were on the St. Clair River project.
What machine is best for river dredging and sediment removal?
The best machine depends on current, depth, debris and the discharge route. For river dredging and sediment removal, this spud ladder dredge holds the dredge in position while the rotating suction head works along the plan. River and canal work also calls for checks on current, navigation, debris and the discharge corridor before the dredge is mobilized.
What is the best low-turbidity dredge for environmental sediment removal in wetlands?
A low-turbidity dredge for wetlands should cut only what the plan calls for and hold its position. This spud ladder dredge uses a rotating suction head, dual RTK GPS and depth sensors to limit disturbance, and works to 27 feet. Check water depth, access and permit limits first.
What dredging equipment do municipalities use for lagoon cleaning?
It depends on the lagoon’s depth, access and liner. This dredge handles abrasive, high-solids slurry and suits government and municipal water projects, including wastewater dredging in deeper lagoons. For lined or shallow lagoons, look at the Dredge Sled or Liner-Safe Dredging Options.
What are the negative effects of dredging?
Dredging can resuspend sediment, disturb habitat and bottom conditions, and release contaminants if material is disturbed without controls. The removed sediment also needs a safe place to go. Accurate positioning, controlled cutting, monitoring and a plan for the dredged material help limit these effects. Environmental performance depends on the complete design and operating plan.
How much does it cost to dredge a lake?
Cost depends on the volume and type of sediment, water depth, production rate, discharge distance, power, mobilization, and how the dredged material is contained, treated and disposed of. Send us your site details and our dredging team can help define the system and the quote.
LET’S PUT YOUR PROJECT IN MOTION
Tough material?
Bring it to EDDY.
Tell us what you’re pumping, where it needs to go, and what your
operation needs to achieve.
Talk it through
with our team.
Equipment selection, project planning, or an existing pump—we’ll help you find the right next step.
CALL SALES & ENGINEERING
+1 619-404-1916
EMAIL YOUR PROJECT DETAILS
info@eddypump.com